Current ADU And JADU Rule Snapshot
-
ADU: attached or detached unit on a lot with a proposed or existing primary residence,
with independent living facilities.
-
JADU: up to 500 square feet, within a single-family residence, with a kitchen or
efficiency kitchen.
- San Diego City indicates a building permit is required to create an ADU or JADU.
-
San Diego City comparison table lists ADU size range at 150 to 1,200 square feet and
JADU size range at 150 to 500 square feet.
-
San Diego City notes parking is generally not required for ADUs except in the Beach
Impact Area; JADU parking is listed as not required.
Setbacks, Height, And Encroachments
-
San Diego City guidance indicates no side/rear setback is necessary for certain ADUs
under 16 feet outside Very High Fire Hazard Severity Zones.
-
A minimum 4-foot side/rear setback applies when ADU/JADU height exceeds 16 feet adjacent
to residential premises, and in Very High Fire Hazard Severity Zones.
-
New detached ADU structures must still comply with the zone front setback; side/rear
flexibility may apply per code.
-
San Diego City states ADUs may encroach into side/rear setbacks, but certain features
(for example exterior staircases and roof decks) cannot encroach.
Bonus ADU, Accessible Bonus, And Condominiums
-
San Diego City ADU Bonus Program: in Sustainable Development Areas, one additional
non-deed
restricted bonus ADU may be allowed for each qualifying deed-restricted ADU, with a
stated 15-year affordability term.
-
Outside Sustainable Development Areas, San Diego City states the maximum number of
bonus ADUs is one when qualifying deed-restricted ADUs are proposed.
-
Accessible Bonus ADU pathway may apply when two affordable ADUs are provided and
accessibility standards are met.
-
San Diego City indicates ADU condominiums can be separately sold in certain cases,
while ADUs built through the ADU Home Density Bonus program are not eligible for
separate sale.
Permit Path And Plan Review
-
1) Pre-check zoning and overlays
Confirm zoning, Coastal Overlay status, and Sustainable Development Area status in
San Diego City tools before design decisions.
-
2) Select custom or preapproved plans
San Diego City accepts certain regional preapproved plans and notes a 30-day review
target for applications using preapproved plans, subject to code compliance.
-
3) Submit building permit application
Apply through Development Services and track review milestones through San Diego City
systems.
-
4) Final inspections and closeout
Complete inspections and finalize required documents, including any JADU agreement or
subdivision-related filings if applicable.
2026 Proposed Rules And Public Process Watch
San Diego City Planning's 2026 Land Development Code Update page describes 134 proposed
amendments
(103 citywide and 31 downtown). Not every amendment is ADU-specific, but code changes can
affect housing and permitting pathways.
-
Land Use and Housing Committee hearing reference: March 5, 2026 (as listed on the San
Diego City page).
- Planning Commission hearing reference: February 19, 2026.
- City Council hearing reference on the City page: May 11, 2026.
-
DSD Regulatory Updates page lists 2025 and prior legislative sessions, including ADU and
JADU-related state bills.
City Planning And Decision-Maker Directory
For applicants tracking policy direction and proposed ordinance work, these are key public
offices and bodies linked from official San Diego City pages.
Executive And Legal Offices
- Mayor Todd Gloria
- City Attorney Heather Ferbert
- Office of the City Clerk
City Council (Districts 1-9)
- Joe LaCava, Jennifer Campbell, Stephen Whitburn
- Henry Foster III, Marni von Wilpert, Kent Lee
- Raul Campillo, Vivian Moreno, Sean Elo-Rivera
Planning And Land Use Bodies
- Land Use & Housing Committee
- Planning Commission
- City Planning LDC Update Team